Installation Steps
- Engineering Line Measurement
- Wall & Column Rebar Binding
- Specialty Reservation Preparation
- Wall or Column Panel Installation
- Flat tie and PVC Sleeve Installation
- Beam Panel Installation
- Deck Panel
- Staircase Formwork
- Drop Frame Installation
- Formwork Inspection
- Concreting of Structure
- Formwork Dismantle
- Move to the next assembly